Yes, automatic bollards need a concrete pit for the retracting cylinder, drainage and control equipment. Depth depends on the model, from around 0.5 m for light-duty units to over 1 m for high-security types.
The pit also needs a drainage path so water does not collect, and ducts for power and control cables. Underground services must be checked before excavation. A site visit confirms depth and layout, so ask us about automatic bollard installation for your entrance.
People also ask
- What is the difference between fixed, removable and automatic bollards?
- What materials are bollards made from?
- How do bollards integrate with traffic lights and access control?
- Do you serve areas outside Abu Dhabi?
- A car hit my bollard. What should be checked before it is repaired?
- Why is my automatic bollard rising slowly or sticking?

